Rank the following constraints by which will be the binding bottleneck gating US AI data-center power availability in 2027 (most binding first).
Category: industry
Status: open | Type: ranking | Timeframe: long
Context
Synthesizes Assumptions 2-4 into a single prioritization the PM needs to size positions - which sub-sector (T&D equipment, gas-turbine OEMs, IPPs/merchant power, grid-interconnection-exposed utilities) carries the most asymmetric repricing. Ranking forces the board to commit to where the binding constraint actually sits.
Resolution source: NERC 2026 Long-Term Reliability Assessment + EIA Short-Term Energy Outlook + grid-operator (PJM/ERCOT/MISO) load-growth filings identifying the cited binding constraint.
Resolution date: 2027-12-31
Created: 2026-06-10